
_Design
Calculation of the heat requirements, Final Design, Work Management and consulting services aimed at gaining access to POR FESR and Conto termico 2.0 incentives for the upgrading of the central heating system, through the replacement of the two existing heat generators with new condensation type models, each with a power rating of 113 kW, the adaptation of the room and central temperature control system, and the adaptation of the methane gas adduction network and the installation room to comply with the recent regulations. Project total: € 86,453.